Quick Summary
Choosing between aj demolition vs super demolition depends on your project’s scope, not brand recognition. Compare both contractors on identical criteria: services listed, asbestos and demolition licences, public liability insurance, line-by-line quote inclusions, realistic timelines and similar-project references.
- Confirm each contractor holds a demolition licence and an asbestos licence, checked against the NSW register.
- Request written quotes with identical scope, assumptions and exclusions so the totals are actually comparable.
- Ask for a current public liability certificate of currency and note the stated coverage limit.
- Check whether asbestos removal is handled in-house or subcontracted before comparing prices.
- Ask two or three referees from similar projects whether the final invoice matched the original quote.
Table of Contents
- How AJ Demolition and Super Demolition Compare at a Glance
- Services Offered: Residential Demolition, Strip-Outs and Site Clearance
- Licensing, Insurance and Asbestos Credentials to Verify
- Demolition Quote Comparison: What Is and Isn’t Included
- Demolition Project Timeline and Contract Terms
- Demolition Contractor Checklist for Choosing Between Them
- Booking a Free Demolition and Asbestos Removal Quote
- Frequently Asked Questions
How AJ Demolition and Super Demolition Compare at a Glance
Choosing between AJ Demolition and Super Demolition comes down to what your project needs, not which name you recognise, and the aj demolition vs super demolition comparison works best when you check the same criteria for both firms. The useful comparison is a structured check of services, credentials, coverage, quote transparency and documented customer evidence. This guide sets out that framework so you can compare the two on identical terms.
Most homeowners and developers start by comparing websites when weighing up aj demolition vs super demolition, which is a sensible first step. The harder part is comparing like with like: the scope of work, what the quote includes, and who holds the licences needed for asbestos. Where a claim cannot be verified from public records or a written quote, ask for it directly.
The table below summarises the comparison dimensions that actually change a decision.
| Factor | What to Check for Each Contractor | Why It Matters |
|---|---|---|
| Services listed | Residential demolition, partial demolition, strip-outs, site clearance, asbestos removal | Confirms the job type is covered in-house rather than subcontracted |
| Licensing | Demolition licence number and asbestos licence number, both checked on the NSW register | Required for lawful demolition and asbestos work; licences are not interchangeable |
| Insurance | Current certificate of currency for public liability, with the limit stated | Determines who pays if a neighbouring property is damaged |
| Coverage | Suburbs served and whether travel affects the quote | Affects scheduling and mobilisation cost |
| Quote detail | Inclusions, exclusions, disposal, approvals, variations | Makes two prices genuinely comparable |
| Timeline | Start date, on-site duration, approval lead times | Affects your build schedule and holding costs |
| Customer evidence | Review themes, dates, sample size, response to complaints | Shows pattern rather than isolated anecdote |
| Contract terms | Payment milestones, delay triggers, variation pricing | Protects you if the site reveals surprises |
Where a company does not publish licence numbers or a clear scope, ask for them directly before you compare prices. A contractor that cannot produce a licence number and insurance certificate on request is not a like-for-like option, regardless of the headline price.
Treat that as a prompt to interrogate the written scope, not as proof about either firm. Ask each contractor for two or three references from projects similar to yours, a tight urban knockdown, an internal strip-out, or an asbestos removal job, and ask those referees specifically whether the final invoice matched the quote. You can also review experienced demolition contractors in Sydney before you decide.
Services Offered: Residential Demolition, Strip-Outs and Site Clearance
Demolition work is not one service. A full house knockdown, an internal strip-out of a shop fitout and a clearance of a block before construction each need different equipment, crew and disposal arrangements. Start by confirming which of these your project needs, then check whether each contractor lists that exact service.
Mission Demolition offers full and partial demolition, asbestos removal, strip-outs and site clearance for residential, commercial and industrial projects.
When you compare the two businesses, look for:
- Whether residential demolition is listed as a core service, not an add-on
- Whether internal strip-outs for commercial tenancies are offered
- How site clearance handles debris removal and levelling
- Whether asbestos removal is handled in-house or subcontracted
A common mistake is assuming a demolition company can also do asbestos removal. Confirm that the same firm holds the asbestos licence for the work, or you may end up coordinating two contractors on one site.
Licensing, Insurance and Asbestos Credentials to Verify
Licensing is the first thing to verify and the easiest to overlook. Demolition and asbestos work must be carried out by appropriately licensed contractors, and the licences are not interchangeable. Read about current NSW asbestos rules and licensing penalties before you hire. Ask for the licence numbers and check them against the official register before you sign anything.
Mission Demolition holds an asbestos licence (No: AD213684) and a demolition licence (No: AD213693). Ask any contractor you compare for equivalent details, along with a current certificate of currency for public liability insurance.
Use this short checklist when you verify credentials:
- Demolition licence number, checked on the NSW register
- Asbestos licence number, covering the specific work type
- Current public liability insurance certificate
- Written confirmation of how asbestos waste is transported and disposed of
- Named supervisor responsible for the site
Ask who is liable if asbestos is found after work has started. A reputable contractor will explain its asbestos survey process and how unexpected finds are handled in writing.
Demolition Quote Comparison: What Is and Isn’t Included
Two quotes can look very different even when they cover the same house. One may include asbestos removal, disposal fees and site cleanup, while the other lists only the demolition itself. Before comparing totals, line the quotes up item by item and convert both to the same scope.

!A homeowner and a demolition contractor reviewing a printed quote together at the edge of a residential site with a fence and house in the background
Look for these inclusions and exclusions in each quote:
- Asbestos survey, testing and removal costs, and whether the removal is priced per square metre or as a lump sum
- Disconnection of water, gas and electricity, and who lodges the requests
- Skip bins or truck loads for waste disposal, including the number of loads allowed before extra charges apply
- Site clearing and levelling after demolition, and whether topsoil or fill is included
- Council and permit fees, or written confirmation that they are excluded
- Protection of neighbouring fences and property, and any bond required by the council
- Traffic management, especially on narrow or busy streets
- Working hours and any noise or dust controls required by the consent
Pricing depends on quantity, dates and delivery, so ask Mission Demolition for current prices or a quote. For context, see Australian interior demolition cost benchmarks and asbestos cost drivers. A quote is only as reliable as its written scope, so ask each contractor to state the assumptions behind the number, for example, the assumed number of waste loads or the assumed asbestos quantity. If those assumptions differ, the totals are not comparable.
A practical way to normalise two quotes is to build a like-for-like schedule. List every line item above, mark each as included, excluded or provisional, and price the exclusions yourself using a second quote or a published rate. The difference between the headline totals often disappears once exclusions are priced in.
Watch out: a quote that is much lower than the others often excludes disposal or asbestos removal, or treats asbestos as a provisional sum that will be charged at a higher rate once found. Ask what is missing, and ask how a variation is priced, before assuming it is the better deal.
Ask every contractor, including Mission Demolition, for a line-by-line quote so the inclusions are clear. Request the quote in writing, with the scope, assumptions, exclusions and variation rates stated, and compare that document, not the headline figure, against the other contractor’s.
Demolition Project Timeline and Contract Terms
Timelines are where many projects slip. The time a demolition takes on site is only part of the picture. Council approvals, asbestos surveys and waste disposal bookings can all add weeks before work starts. Ask each contractor for a realistic start date that accounts for these steps.
Check the following in the contract:
- Estimated start and completion dates, with what triggers a delay
- Who arranges approvals and whether the cost is included
- Payment milestones and how variations are priced
- Exclusions, such as unexpected contamination or ground conditions
- Insurance and liability for damage to neighbouring properties
If you are building soon, a contractor’s ability to commit to a clear schedule matters more than a short estimate. A realistic timeline you can plan around is more useful than a promise that is hard to keep. Our guide to NSW demolition approval timeframes explains which documents most often cause delays.
Demolition Contractor Checklist for Choosing Between Them
Use this checklist to make a fair comparison once you have quotes from both businesses:
- Confirm both hold the licences required for your specific work.
- Request written quotes with identical scope so prices can be compared.
- Ask how asbestos is identified, removed and disposed of.
- Check public liability insurance and what it covers.
- Compare timelines and the terms for delays or unexpected findings.
- Ask for references from projects similar to yours, such as a tight urban site or a commercial strip-out.
- Confirm who is your point of contact during the job.
A common mistake is choosing on price alone. The cheapest quote may leave out disposal, approvals or asbestos work, which you will then pay for separately.
Booking a Free Demolition and Asbestos Removal Quote
Comparing contractors is easier when you have a written quote for your own site. Mission Demolition offers a free demolition and asbestos removal quote. Send us your site details and we will set out the scope, inclusions and timeline in writing.
Get a Free Demolition And Asbestos Removal Quote from Mission Demolition, and make your comparison on the same terms.
Frequently Asked Questions
What services do AJ Demolition and Super Demolition offer?
The most reliable approach is to check each company’s current service list against your project. Confirm whether they handle full or partial demolition, asbestos removal, strip-outs and site clearance, since not every contractor offers all of these in-house. Ask each business to put its service scope in writing so you can compare like for like before requesting a quote.
How should I compare demolition quotes from different contractors?
Compare quotes line by line rather than by the total alone. Check whether each price includes asbestos testing and removal, waste disposal, utility disconnection, site cleanup and any council or permit costs. A lower total often means fewer inclusions, so a cheaper quote can end up costing more once extras are added. Request written scopes from each contractor and ask what would trigger a variation.
How can I check whether a demolition contractor is licensed and insured?
Ask for the contractor’s licence numbers and verify them directly with the relevant licensing authority. Ask for a copy of their public liability insurance certificate. Mission Demolition holds Asbestos License No: AD213684 and Demolition license No: AD213693.
What should I ask a demolition contractor before hiring them?
Ask who will be on site, how asbestos is identified and removed, how waste is documented and disposed of, and how neighbouring properties are protected. Ask what happens if unexpected materials are found during the job and how variations are priced and approved in writing. Request a realistic timeline and clarify any exclusions before signing a contract.